Klima-Therm Completed Projects...

Project Name: QQA10

Replacement required due to age of existing equipment, space liberation and
environmental/running cost considerations. To replace 3-off chillers and associated pipework without loss of services. A Key client requirement was that at all times during the replacement chilled water services must be maintained >>> read more

Project Soter for The London Stock Exchange

Plant Replacement / Enhancement - Replacing 4-off York Centrifugal chillers on R1234, replacement required due to age of existing equipment, refrigerant type and environmental/running cost considerations. A key client requirement was that at all times during the replacement works one chiller must be running with a second available to run on stand-by... >>> read more

The National Archives

The right environmental conditions in The National Archives’ repositories at Kew are crucial to maintaining the nation’s heritage for generations to come; unless temperature and humidity levels are strictly controlled, these important documents could suffer lasting damage

“We opted for Klima-Therm’s Turbomiser primarily for their efficiency and the proposed energy savings, but also for their professionalism” Kevin Skinner, Ecovert FM >>> read more

More from our extensive range...

Chillers

See our versatile and comprehensive range of chillers, the energy saving Turbomiser plus more about our company offerings and associated products right here...

AHU

We source air handling units from three of the leading European manufacturers, which gives us a comprehensive and versatile product range to meet all customer needs...

Terminal Units

We supply the cost effective, technically advanced and flexible range of Eurapo fan coil units and controls at competitive prices plus chilled beams from Cosy of Sweden

Confidence

working with a group of companies dedicated to excellence

in cooling and air movement solutions... Klima Therm part of The Calibre Services Group